EV Base Installation

This course walks you through the full installation process of the Smappee EV Base, with serial numbers starting with 603. You’ll learn how to prepare the site, connect power and internet, and configure the system for reliable operation.

You’ll learn how to:

  • Prepare the foundation, power supply, and internet connection for a stable setup.
  • Install the EV Base securely and according to best practices.
  • Configure the EV Base using the Smappee dashboard and tools.


Parcours éducatif Smappee AC Charging stations
Dernière mise à jour 03/07/2025
Temps d'achèvement 19 minutes
Membres 5
English Intermédiaire Installateur Chef de projet Smappee EV Base
    • Smappee EV Base
    • EV Base Installation
    • AC line Configuration