EV Base Installation

This course walks you through the full installation process of the Smappee EV Base, with serial numbers starting with 603. You’ll learn how to prepare the site, connect power and internet, and configure the system for reliable operation.

You’ll learn how to:

  • Prepare the foundation, power supply, and internet connection for a stable setup.
  • Install the EV Base securely and according to best practices.
  • Configure the EV Base using the Smappee dashboard and tools.


Lernpfad Smappee AC Charging stations
Zuletzt aktualisiert 03.07.2025
Zeitaufwand 19 Minuten
Mitglieder 5
English Mittel Installateur Projektleiter Smappee EV Base
    • Smappee EV Base
    • EV Base Installation
    • AC line Configuration